Trace a supplier's delay to the machine

A delay mail followed through the ERP, the maintenance system and the MES — and a reply not written when the data said it would be wrong.

A supplier's "we are late" mail only matters if something is waiting for that part. Finding out means four systems and the keys that join them: PO number, material, spare part, work order, machine.
Team
Purchasing
Typed by
Plant engineer
Works with
Engineering mailbox, ERP (SQL Server), CMMS (MySQL), MES (PostgreSQL)
Delivers
Excel trace per delayed material, and an honest answer

The request, as typed

Suppliers have written about delivery delays. Find those mails, look up each order in the ERP and the materials still open on it, check in the CMMS which work orders are waiting for those parts, and in the MES which machine and area each one is on. Write outputs/delay-impact.xlsx with one row per delayed material, and tell me which delay hurts us most.
seib Cowork, it won't write a wrong mail: The follow-up: the premise doesn't hold in the data, so it says so and offers the mails that would matter.
The follow-up: the premise doesn't hold in the data, so it says so and offers the mails that would matter.Open full size

What it did.

It stopped to ask before writing the Excel file.

  1. 1

    Searched the mailbox, found that supplier mail sits in the Vendors folder, and read the delay mail.

  2. 2

    Looked up the purchase order and its lines in the ERP.

  3. 3

    Checked the maintenance system for work orders waiting on those materials, by material number and by spare-part number.

  4. 4

    Wrote the trace to Excel, one row per delayed material, after asking.

  5. 5

    Asked next to draft a reply to the supplier, it declined: the order had already arrived, and it offered three useful mails instead.

What came back.

The only delay mail concerned PO-4500010246, which the ERP shows as fully received, and no work order waits on its materials, so no delay hurts today. Asked for a chasing mail anyway, it explained why that mail would be wrong and offered alternatives: a close-the-loop note to the supplier, a chase for the real bottlenecks among 21 work orders waiting for parts, or a reorder for a spare below minimum.

Every screen is a capture of seib Cowork 0.2.5 running the request shown with seib-1, the real model, with no step scripted. The systems and documents are seib’s test environment: two fictional companies, Nordhafen Components (a machine-building plant) and the Brennholt Group (a six-company group), with generated data. Where a folder carries project instructions, such as the names of a database’s tables, the run used them, as a customer’s would. Names, keys and file paths of the machine that ran it are masked; nothing else on a screen is changed. No customer data appears.

Request pilot access.

Not a waitlist. Tell us the problem and we’ll tell you honestly whether seib is ready for it.

  1. 1A person reads your request and replies within a few business days.
  2. 2A short call about the line, the toolchain and what's slow today.
  3. 3A Cowork pilot starts with one team, read-only connectors and two or three knowledge bases.
Pilot request, confidential0 of 5 complete
Interested in